Little Wings Early Learning Center - Built in 1999

Dollar amounts referenced below are estimations based off of previous projects, square footage dollar amounts, and conversations with contractors, architects, and engineers. These numbers do not reflect actual quotes or bids on projects. All costs listed are preliminary and budgetary in nature. They would continue to be finalized upon the passage of a bond as projects are designed in partnership with our school community.


A building expansion would provide additional space for student learning and activities. Current planning anticipates an auxiliary multipurpose space, similar to a small gym, along with two additional classrooms. Final uses and configurations will be determined through the design process.

Associated site work would include the infrastructure, utility connections, and other site modifications necessary to support and integrate the addition with the existing building.

In the majority of the classrooms around our district, desks, tables, and chairs are worn and damaged. We have equipment that is not conducive to today's learning environment and are mismatched which does not provide a consistent learning space for all students. The district has extended the life on many pieces of classroom furniture by replacing and welding parts while also swapping between buildings to create complete classroom sets.

The district intends to replace classroom furniture sets with the 2026 bond.


This technology would support safety and security at the Early Learning Center, including security cameras and related systems.

These improvements would help staff monitor the building and surrounding areas and support a safe, secure environment for students, staff, and visitors.